GRL USB PD 3.1 test fixture, which is comprised of the following:
|
Note: Granite River Labs recommends connecting the extension fixture/board to the GRL-USB-PD-C2 test controller only when it's powered-off. Requiring GRL-USB-PD-EPR software option
Contact GRL to request a quote and order GRL USB PD 3.1 Pre-compliance Board (GRL-USB-PD-EPR).
COPYRIGHT 2024 GRANITE RIVER LABS INC. ALL RIGHTS RESERVED.